ICT703 Network Technology And Management Assignment

ICT703 Network Technology And Management Assignment

ICT703 Network Technology And Management Assignment

ICT703 Network Technology And Management Assignment

Question:

Using the Internet and locally available resources, select a high-speed, color copier/printer for the CAC offices. Provide supporting details to justify your selection.
Demonstrate a network layout for CAC requirements – you can use Figure 3 as the starting point. Because the company has limited funds available for this project, it is important that where possible only equipment designed for the small business and home markets be used. Provide supporting details to justify your selection of each equipment type, e.g., access points, switches and routers.It is necessary to plan the Internet connectivity, and which services are provided by the ISP and which services must be provided in-house. Larger companies usually provide services in-house, while small businesses and individuals normally rely on an ISP to provide these services. Most ISPs offer a variety of services and service levels. Selecting an ISP is complicated, and not all technologies and services are available in all regions of the world.

Using the Internet, research alternative local ISPs to provide connectivity for CAC. If selected, CAC will rely upon this ISP for DNS and web mail. The ISP must also provide 99.999% uptime for access to the internal FTP/email server. Because you are the only IT person at CAC, it is also important that the ISP provides a high-level of technical support. Create a comparison worksheet for at least two local ISPs, including costing.

Which internal services must be offered by CAC, and which devices provide these services? Provide supporting details to justify your answer.

Answer:

Introduction

Network Infrastructure is the backbone for any business to grow (Karyakina and Melnikov, 2017). Color Ability Corporation (CAC) has grown and wants to move to a more spacious building. A network enables employees to share resources, data, and information regardless of their location as long as they are connected to the internet (Di Corato, 2013). It is this network ability that has made it necessary for companies and institutions to invest in network infrastructure. CAC is a marketing and advertising company as such they need it needs to connect with the client in the most efficient and effective way.

CAC has acquired a four story building in Brisbane CBD and they are planning to move to the new building in three months. However, before they move, a network infrastructure has to be set in up order to meet the following requirements: allow employees and managers to share files securely, facilitate email communications and allow all the employees to access emails from anywhere, to securely store project files in a central location, set up wireless connection in all the five departments, and allow sharing of physical resources such as printer and scanner (Wickboldt, et al., 2015).

The following are the objectives of the project:

  • To set up a network that will allow managers and employees to share files.
  • To set up wireless connection in all the five departments.
  • To allow employees to access emails from anywhere
  • To set up secure central location to store project files.
  • To set up a network that will allow sharing of resources.

In order to meet the set objectives, the project tasks will be subdivided into sub tasks. The project will be broken down into 6 sub tasks, project planning, requirements gathering, design, implementation, testing, and handover and documentation (Woodward and Feuer, 2013).

Timetable

Task Time (days) Start date End date
Project planning and requirements gathering 15 September 15, 2018 September 29, 2018
Design 10 September 30, 2018 October 9, 2018
Implementation 50 October 10, 2018 November 29, 2018
Network Testing 5 November 30, 2018 December 4, 2018
Documentation 80 September 15, 2018 December 4, 2018


Table 
1: Project Timetable

No Item Quantity Estimated Cost ($)
1 Computers 60 5000
2 Servers 6 700
3 Access points 5 450
5 Routers 2 300
8 Printers 5 1000
6 Switches 5 550
9 ISP Subscription 24 1400
Estimated Budget 9400


Table 
2: Project Estimated Budget

Activity 1

Department: General Use
Location: Brisbane and Sydney
Component Recommendation
Processor Intel Core i7-7700 3.6 GHz
Memory 8 GB DDR4
Hard Drive 2 TB SSHD
CD-ROM/DVD DVD/CD R/W
USB Ports Total:6,  back:4, front:2
Video Card NVIDIA GeForce GT 730; refresh rate 60Hz
Sound Card ALC3863-CG
Modem Internal modem 4800 bps
Operating System Windows 10 pro-64 bit
Monitor Size: 21, Resolution: 2560x 1600, Refresh rate: 60Hz
Printer Kyocera M3560idn
Speakers Internal speakers Azalia 5.1 channel
Internet Connection LAN: 1000 Base-T


Table 
3: General Purpose Computer Specifications

(Source: Athow, 2018)

Department: Graphics Production
Location: Brisbane and Sydney
Component Recommendation
Processor Intel core i7 4.6GHz
Memory 16 GB DDR4 (Upgradable to 32GB)
Hard Drive 1TB 7200 rpm SATA
CD-ROM/DVD DVD R/W
USB Ports Total:6,  back:4, front:2
Video Card Intel HD Graphics 630 refresh rate: 60Hz
Sound Card Conexant CX5001
Modem Internal modem 4800 bps
Operating System Windows 10 pro 64-bit
Monitor Size: 20”, Resolution: 1600x 900, Refresh rate: 60Hz
Printer Kyocera M3560idn
Speakers 2W internal speakers
Internet Connection LAN Realtek RTL8111HSH-CG GbE


Table 
4: graphics Production Computer Specifications

(sources: Matthew, 2018)

Department: Film Production
Location: Sydney
Component Recommendation
Processor Intel core i7-6700 3.4 GHz
Memory 16-32 GB DDR 4
Hard Drive 2TB SSHD
CD-ROM/DVD DVD +/-RW DW316
USB Ports Total:8,  back:4, front:4
Video Card AMD Radeon RX 570; refresh rate: 60Hz
Sound Card JJP Signature series XPS 27
Modem 4800 bps Internal modem
Operating System Windows 10  pro 64- bit
Monitor Size: 27”, Resolution: 3840x 2160, Refresh rate: 60Hz
Printer Kyocera M3560idn
Speakers Internal speakers XPS 27
Internet Connection 10/100/1000 Ethernet


Table 
5: Film production Computer Specifications

(Sources: Levin, 2017)

Department: Email/FTP Server
Location: Brisbane
Component Recommendation
Processor Intel quad-core 2GHz vCPU
Memory 8 GB DDR 4
Hard Drive 1TB SATA
CD-ROM/DVD DVD +/-RW
USB Ports Total:8,  back:4, front:4
Video Card AMD Radeon RX 570; refresh rate: 60Hz
Sound Card PCIe RX 7.1
Modem 9600 bps Internal modem
Operating System Linux Kernel 2.6
Monitor Size: 19”, Resolution: 1280×800, Refresh rate: 60Hz
Printer NA
Speakers Internal speakers Blaster Audigy
Internet Connection 10/100/1000 Ethernet

ICT703 Network Technology And Management Assignment